Post-Construction Cleanup

Final-phase glass, facade and site cleaning that turns a finished build into a move-in-ready property.

Two technicians cleaning entrance glass with water-fed poles
Post-Construction

From build-out to move-in

The final clean is the last trade on site and the first impression at turnover.

  • Final-phase glass, facade and site cleaning
  • Labels, paint and debris removed after build-out
  • Glass inside and out, frames and sills
  • Rolls straight into a recurring program for the new building
  • 100% W2 crews: trained, insured S&K employees
Window Cleaning Programs
Scope

Name every residue

Heavy construction residue takes more time than routine cleaning. Put each one in the scope:

  • Labels, stickers and protective films
  • Paint and stain overspray
  • Mortar, concrete and cement splash
  • Sealant and lubricant smears
  • Sealer runoff from masonry and stone
  • Metal surfaces at entrances and storefronts
Sequence

Clean once, at the right time

StepWhat happens
1. Other trades finishWork near the glass is done.
2. Protection comes offGlass protection is removed.
3. Condition walkWalk and photograph the glass with the general contractor.
4. Test areaTest-clean each glass type and examine it before proceeding.
5. Final cleanGlass, frames, sills, facade and site.
6. Sign-offJoint walkthrough, punch list closed and signed.
7. HandoffThe building moves to its recurring program.
Protect the Glass

Protect the glass, then protect the record

NGA guidance recommends against scrapers, abrasives and harsh chemicals on any glass product, and says heat-treated glass needs extra care. Agree in advance how each residue will be removed, and follow the glass manufacturer's guidance.

  • Write glass protection into the general contractor's scope
  • Walk and photograph the glass before the final clean
  • Agree cleaning methods for construction residue in advance
  • Keep before-and-after photos and a record of any damage found

Scratches found at turnover? Glass restoration can often remove surface scratches faster than replacement glass can be ordered, so the building opens on time. See glass and metal restoration.

Questions

Post-construction cleanup questions

Final-phase glass, facade and site cleaning, including labels, paint and debris left after build-out. Name every residue in the scope: overspray, mortar splash, sealant smears and the rest.

After other trades finish near the glass and protection comes off, and before the final walkthrough and turnover. Cleaning before other trades finish means cleaning twice.

NGA guidance recommends against scrapers, abrasives and harsh chemicals on any glass product, because they can cause irreparable damage. Agree methods in advance.

Photograph them before the clean. Surface scratches can often be sanded, buffed and polished out, and restoration is often faster than ordering replacement glass. Deep scratches mean replacement.

Yes. Post-construction cleanup can roll straight into a recurring program for the new building.

Yes. S&K crews are 100% W2: trained, insured S&K employees, never subcontractors.